8am on Sunday they started to pour the concrete...
By 10:30 we had the patio and step.
The rest of the afternoon they installed the retaining wall for the flower bed. It went from a little suggestion to a big flower bed.
Tamara gave us two 25 lb rain barrels that will be the perfect way to water the flowers and the garden beds.
The concrete is drying and next is the trim work and painting on the back of the house.
The next project is the new deck.
Stay Tuned!
No comments:
Post a Comment